Posts By: admin

Electrical First Fix

Electrical first fix was installed to the main pavilion building.

IMG_2480 1

Vapour Control

A vapour control layer is installed inside and the building sealed in preparation for an air test.

IMG_2484_2 1      IMG_2481 1

Ty Unnos

Work commenced on site at 7am, by 7pm the frame was up and protected from the weather.

IMG_2303 1   IMG_2325 1   IMG_2343 1

Drying Shed Goes Up

The existing building now to be known as the drying shed has been taken down and re-erected in its new location ready for the new Pavilion to be constructed.

IMG_2230 1

Monmouth Farm

Airsource heating the way forward